Our Projects

Industrial CO₂ Refrigeration System, Quebec

Electrical design and protection calculations for an industrial refrigeration system using 100 HP CO₂ compressors

  • MCA and MOP calculations

  • Protection selection

  • Conductor sizing

  • Power panel design

  • Coordination with equipment manufacturers

Certification de panneau de contrôle industriel


Support for manufacturers in obtaining industrial control panel certification.

  • Electrical schematic review

  • Component verification

  • Validation SCCR

  • Technical support throughout the certification process


Battery Energy Storage System (BESS)


Engineering support for the preparation of conformity tests of an energy storage system.

  • Applicable standards analysation

  • Development of the test plan

  • Coordination with the testing laboratory

  • Technical review of test scenarios

PLC program modification
  • Modifying PLC programs

  • Adding new control features

  • Integrating new equipment and instruments

  • Configuring variable frequency drives (VFDs)

Copyright © 2025 WZ consultant

email : Info@wzconsultant.ca
Phone: 514 446 2302

Follow us !